A guardrail pile driver is specifically designed to drive piles into the ground to install guardrails along roads, bridges, and other areas where safety barriers are required. YG brand offers a diverse range of guardrail pile drivers for sale. These machines come in different sizes and configurations to suit various job requirements. They are engineered to be robust and reliable, capable of withstanding the rigors of continuous use in construction sites. The overall design emphasizes ease of operation, making it accessible for operators with different levels of experience.【WhatsApp/WeChat/Phone/Skype】+86 136 1385 6800
Guardrail Pile Driver Parameter:
Model | Small four-wheel | Drive mode | Rear wheel drive forward direction |
Power | 37kw | Walking style | Hydraulic motor double-walking |
Rotating speed | 2400 r/min | Tires | Four Wheels650-16 |
Oil pump | Dual oil pump | Motor | Yunnei 490 |
Chassis | Stable car chassis | Shipping Dimensions | 3.4*2.1*2.75m |
Weight | 3.5T | Cooling system | Dual fan cooling |
Braking method | Air brake |
Working Principle of the Guardrail Pile Driver:
- Positioning pile position: According to the design drawings of the guardrail project, determine the exact position of the guardrail column. The operator can determine the pile position by visual inspection or using a positioning tool.
- Placing the column: The operator places the guardrail column on the pile frame and adjusts the verticality and position of the column to ensure that the column meets the design requirements.
- Hammering pile sinking: Start the hydraulic system, and the hydraulic hammer, driven by hydraulic pressure, continuously impacts the top of the column. The impact force overcomes the resistance of the formation and causes the column to sink into the ground gradually.
- Controlling depth: The operator controls the pile driving depth according to the geological conditions and guardrail design requirements. The pile driving depth can be monitored by the scale line on the column or the depth sensor of the pile driver.
- Completing pile driving: When the column reaches the predetermined depth, stop hammering and complete the pile driving operation of a single column. Repeat the above steps to complete the column installation of the entire guardrail project.
Customer Feedback of Guardrail Pile Driver:
Case 1: A leading construction company in Florida was working on a large highway construction project. They purchased a guardrail pile driver from YG. The project manager said, “The YG guardrail pile driver is a game changer for us. It is very efficient and precise. We were able to complete the guardrail installation ahead of schedule. It is also very reasonably priced compared to other brands we looked at, and YG’s after-sales service is first-rate.”
Case 2: A company responsible for maintaining multiple commercial properties in Ohio purchased a YG brand guardrail pile driver. The maintenance supervisor commented, “This guardrail pile driver makes our guardrail installation and maintenance work much easier. It is easy to operate and saves a lot of labor costs. YG provided us with excellent training on how to use the machine, and we are very satisfied with our purchase.”
Guardrail Pile Driver for Sale – YG Machinery Manufacturer
In short, the guardrail pile driver is indispensable key equipment for the construction of modern traffic guardrail projects, and the YG brand has become your best partner for traffic safety engineering construction with its high-quality, high-performance, cost-effective products and factory direct sales. If you want to know more technical details and application cases of the guardrail pile driver, please contact us immediately to get a professional consultation and quotation.【WhatsApp/WeChat/Phone/Skype】+86 136 1385 6800